Default financial assumptions will be applied — adjust them in Step 4 Financial Analysis.
Net AEP
—
GWh/yr
Specific Yield
—
kWh/kWp/yr
Capacity Factor
—
%
CUF
—
%
Perf. Ratio
—
%
CO₂ Avoided
—
kt/yr
Production Exceedance
P50 (median)
—
GWh/yr
P75
—
GWh/yr
P90
—
GWh/yr
Insights
📊
Run Step 3 first
Complete the Power & Energy step to unlock financial analysis.
Financial Assumptions
$/kWp
$/kWp/yr
%
$/MWh
yr
%/yr
%
LCOE
—
$/MWh
Project IRR
—
%
NPV at PPA
—
M$
Breakeven PPA
—
$/MWh
Total CAPEX
—
M$
25-Year Production Profile
Cashflow
LCOE Sensitivity
CAPEX, WACC and specific yield ±15%/30%. Tornado shows LCOE change vs base case.
Scenarios
Scenario
CF %
CAPEX $/kWp
WACC %
LCOE $/MWh
NPV M$
IRR %
🗺️
Complete Step 4 first
Run Financial Analysis before the site access study.
Grid & Road Cost Inputs
$/km
$/km
LCOE (revised)
—
$/MWh
Site adder
—
$/kW
Revised CAPEX
—
$/kW
IRR (revised)
—
%
Site Cost Breakdown
Item
Distance
Rate
Adder
Base vs Revised Metrics
Metric
Base
With site costs
Change
🌿
Complete Step 4 first
Run Financial Analysis before environmental screening.
Automated Environmental Screening
Screens 5 constraint categories using live OpenStreetMap data: protected areas, settlements, airports, military zones, and wetlands. Each finding is rated Red / Amber / Green based on distance thresholds.
Red (hard constraints)
—
Amber (review)
—
Green (clear)
—
Constraint Findings
Results are indicative only. Verify protected area boundaries against WDPA before investment decisions.